Short answer: the first clinical lot of a first-in-human device does not need years of real-time aging data before it ships. Under ISO 11607-1:2019, accelerated aging is accepted as sufficient evidence for a claimed expiry date until real-time results are available, provided the real-time study runs in parallel. What you cannot do is ship a lot with no defensible expiry date, or extend that date mid-study without data. In Panama, Executive Decree 21 of 2026 makes both points concrete: Article 97 requires the lot and the expiry date on the investigational label, and Article 99 asks the sponsor to file stability studies when the validity of a lot changes from what was previously submitted.
I get a version of this question from almost every early-stage device team once they start planning the first shipment: “We only have a few weeks of aging data. What expiry date do we put on the box, and what happens when the study runs longer than that?” It is a packaging and quality question, but it turns into a timeline question very quickly. A lot that expires in the middle of enrollment is a lot you cannot implant, and a replacement lot means a new certificate of analysis, a new shipment and, in some countries, a new filing. Here is how I walk sponsors through it.
Why shelf life is a first-in-human problem, not a commercial one
Most device teams think of shelf life as something they will validate properly before launch. For the first-in-human study, three things make it urgent earlier:
- The label needs a date. Investigational labeling rules ask for a lot and an expiry. In Panama that is written into Article 97 of Executive Decree 21 of 2026, the regulation that governs health research since 23 April 2026.
- The regulator reviews the product before the study starts. Article 95 of the same decree gives the Dirección Nacional de Farmacia y Drogas (DNFD) the evaluation of the investigational product and its handling before a high-risk study such as a clinical trial begins, through the RESEGIS platform, with a certificate of analysis and the investigator’s brochure in the file. The decree gives DNFD up to 15 business days to answer.
- Enrollment is slower than the plan. First-in-human studies enroll in stages, often with pauses for safety review between the first cases. A lot made in month one may still be on the shelf in month nine. If its labeled expiry is six months, you have a problem you could have seen coming.
What the standards actually allow
The packaging standard for terminally sterilized devices is ISO 11607, in two parts: ISO 11607-1:2019 covers materials, sterile barrier systems and packaging systems, and ISO 11607-2:2019 covers validation of the forming, sealing and assembly processes. On shelf life, the two sentences that matter come from clause 8.3 of Part 1, as quoted in ASTM F1980-21:
- “Stability testing shall demonstrate that the sterile barrier system maintains integrity over time.” (8.3.1)
- “Stability testing, using accelerated aging protocols, shall be regarded as sufficient evidence for claimed expiry dates until data from real-time aging studies are available.” (8.3.3)
ASTM F1980-21, the guide most labs use to design accelerated aging, says the same thing from the other side. It states that real-time aging studies must be conducted in parallel to accelerated studies, carried out to the claimed shelf life and performed to completion, and that an expiry date built on accelerated data is tentative until the real-time results are in.
In practice, accelerated aging follows the Arrhenius-based relationship in ASTM F1980: the accelerated aging factor is Q10 raised to the power of (accelerated temperature minus ambient temperature) divided by 10. A Q10 of 2 is the common conservative assumption when little is known about the materials. F1980 says conservative factors must be used in that case, and more aggressive ones need documented evidence correlating real-time and accelerated results. Run the numbers with your test lab and write down the justification. A reviewer will ask where your Q10 came from before they ask anything else.
The plan I recommend for the first clinical lot
- Decide the expiry claim from the enrollment plan, not the other way around. Estimate when the last device from the first lot could realistically be implanted, add a margin for slow enrollment and safety pauses, and set the target shelf life from that. Then size the aging study to support it.
- Start real-time and accelerated aging on day one, from the same lot. Put real-time samples on the shelf when you put accelerated samples in the chamber. The real-time study is what lets you extend later, and it cannot be started retroactively.
- Test the packaging system, not just the pouch. Seal strength and package integrity after aging, plus distribution simulation (ASTM D4169 is the common method) on the configuration you will actually ship. For Latin America that usually means a long route with a customs hold, so test with that in mind.
- Cover the device, not only the sterile barrier. ASTM F1980 notes that its approach can also be used for the device and its materials. If the device has a coating, a polymer that can drift, a battery or a drug component, aging of the sterile barrier alone does not support the expiry date on the label.
- Put the claim on the certificate of analysis and the label. The lot’s certificate of analysis should show the manufacturing date and expiry consistent with the label. Article 97 in Panama lists the minimum label content: identification (name or code), lot, expiry date, storage conditions and special warnings where they apply.
- Plan the extension before you need it. Schedule real-time pull points that land ahead of the labeled expiry. When a pull point passes, you have the data to support a longer date. In Panama, Article 99 asks the sponsor to submit, when necessary, the stability studies that support a change in the validity of a lot compared with the technical documentation previously filed. Treat that as a filing with its own lead time, not as a relabeling task for the site.
Labeling language: Spanish first
Article 97 accepts investigational labeling in Spanish or in several languages at once, as long as one of them is Spanish. English-only labeling is accepted only in exceptional cases, with prior justification to DNFD, and the decree still requires that the relevant information reaches the participant in Spanish. If the same lot may also supply a US early feasibility study, plan a multilingual label from the start. Under 21 CFR 812.5, an investigational device or its immediate package must carry the statement “CAUTION—Investigational device. Limited by Federal (or United States) law to investigational use,” along with the manufacturer’s name and place of business. One label that satisfies both is cheaper than two packaging runs.
Common mistakes I see
- An expiry date nobody can justify. A date chosen to fit the study calendar, with no aging protocol behind it. It may get through the first review. It will not survive a question about the next lot.
- Accelerated data only. No real-time samples on the shelf, so there is nothing to extend with when enrollment slows.
- Relabeling at the site. Changing the expiry on product already at the hospital without the supporting stability data, and without telling the regulator where the rules ask for it.
- Testing a configuration you do not ship. Aging and transport tests done on a different pouch, tray or shipper than the one that goes to Latin America.
- Forgetting the import step. In Panama, Article 99 ties import of investigational products to the RESEGIS project record, ethics approval and DNFD authorization. A replacement lot has to go through the same chain.
Three questions I ask before we fix a first-patient date
- What expiry will the first lot carry, and what aging data and Q10 justification support it?
- Are real-time samples from that lot already on the shelf, and when is the first pull point?
- If enrollment takes twice as long as planned, which lot covers the last patient, and is its certificate of analysis ready?
If the answers are clear, shelf life will not be what delays your study. If they are not, it is much cheaper to fix now than after the first shipment clears customs.
This post covers the time dimension of the investigational device file. For the quality documents themselves, see GMP attestation or ISO 13485 certificate for LATAM first-in-human trials. For biological safety, see ISO 10993 biocompatibility before a Panama first-in-human device study, and for the wider picture on preclinical and sterility expectations, early feasibility trials: GLP, GMP and sterility. When the device moves from study to market, the registration side is on our market access page, and more answers are in the knowledge base.
Julio G. Martinez-Clark is CEO of bioaccess®, a contract research organization focused on first-in-human and early feasibility medical device studies in Latin America.
Sources and notes
- Decreto Ejecutivo No. 21 de 23 de abril de 2026 (Panama, Ministerio de Salud), Gaceta Oficial Digital No. 30510-C, Articles 95, 97 and 99. The decree is drafted in medicines language (“medicamentos o productos para la salud humana”); how each item applies to a device should be confirmed with DNFD and the ethics committee for each study.
- ISO 11607-1:2019, Packaging for terminally sterilized medical devices, Part 1, clause 8.3 (stability testing); ISO 11607-2:2019, Part 2, validation of forming, sealing and assembly processes.
- ASTM F1980-21, Standard Guide for Accelerated Aging of Sterile Barrier Systems and Medical Devices, sections 1.2, 4.3 to 4.5.
- ASTM D4169, Standard Practice for Performance Testing of Shipping Containers and Systems.
- 21 CFR 812.5, Labeling of investigational devices (United States).
- This is practical guidance, not legal advice. Requirements in other Latin American countries differ and should be checked for each filing.